Company History

Limited Liability Company “KRYVBASPROEKT” was established on the foundation of one of Ukraine’s most experienced design and engineering institutes — the State Enterprise “State Institute for the Design of Iron Ore Mining Enterprises ‘KRYVBASPROEKT’”, originally founded in December 1933.

The company’s 90-year history of establishment, growth, and continuous operation is inextricably linked with the development of Ukraine’s powerful mining and metallurgical sector, driven by the raw material base of the Kryvyi Rih Iron Ore Basin (Kryvbas).

Pre-War Period (1933–1941)

From the earliest stages of its development, Kryvbasproekt played a crucial role in transforming underground ore extraction. The institute’s team of design and structural engineers addressed key challenges in the modernization of Kryvbas mines and established core engineering standards. Underground operations and surface facilities underwent comprehensive restructuring: new deposit development schemes and mining technologies were introduced, alongside maximum mechanization of labor-intensive workflows.

Major Kryvbas mines were equipped with modern surface facilities: steel headframes, reinforced concrete and brick shaft houses, crushing and screening plants, rail-loading bins, administrative and amenity complexes, and infrastructure aligned with the technological standards of the era.

Modernization of existing facilities and construction of new mines significantly improved operational performance across the Kryvbas basin: labor productivity rose, while extraction costs declined. By early 1941, annual production capacity had reached 24 million metric tons.

Wartime Period (1941–1944)

During the difficult years of World War II, many staff members joined the frontline forces, while a team of leading technical specialists evacuated together with the engineering archives.

Throughout this period, the institute focused its technical capabilities on a critical objective: supplying metallurgical enterprises with iron and manganese ore. Starting in 1943, specialists assessed equipment and material requirements for rehabilitation work across the Kryvbas mining operations, providing actionable blueprints immediately upon the region’s liberation.

Post-War Reconstruction (1944–1955)

Restoring iron ore facilities was the paramount objective facing Kryvbas engineers and miners. Upon returning to Kryvyi Rih, the institute immediately initiated engineering documentation to rehabilitate destroyed and flooded mine shafts, surface complexes, mine ventilation systems, and essential utility infrastructure. Between 1944 and 1945 alone, 32 mines were restored and commissioned based on the institute’s designs, yielding more than 4.6 million metric tons of iron ore.

By early 1950, all pre-existing mines were fully restored, and several new mining shafts were commissioned. Commercial iron ore production across the Kryvbas basin reached 21 million metric tons in 1950.

Rapid Expansion of Kryvbas (1955–1990)

During this phase, the institute outlined strategic priorities for long-term sector development, focusing on expanding the mineral resource base as the foundation of Ukraine’s mining and metals complex. These priorities were implemented in several stages:

Upgrading active mines and commissioning highly mechanized new shafts expanded total underground production capacity by 22.9 million metric tons.

The most substantial growth occurred between 1955 and 1965 with the construction and commissioning of five major mining and processing plants: Southern (Pivdennyi), Novo-Kryvorizkyi, Northern (Pivnichnyi), Central (Tsentralnyi), and Inhulets (Inhuletskyi).

With the completion of these advanced mines and processing complexes, Kryvbas mining peaked in 1975, reaching an annual commercial iron ore output of 106.9 million metric tons (including 45.3 million metric tons of high-grade ore and 61.6 million metric tons of iron ore concentrate). Output remained above 90 million metric tons per year through 1990.

To support this rapid expansion, the institute engineered a broad network of supporting industrial infrastructure, including ore-repair and mechanical engineering plants, compressor and fueling stations, mechanical maintenance workshops, and dedicated utility systems.

Alongside other research institutions, Kryvbasproekt co-developed Ukraine’s national “Gold of Ukraine” program. Throughout the 1990s, commercial development of Ukrainian gold and polymetallic deposits commenced under the institute’s designs.

In parallel, the institute completed a full spectrum of engineering studies, economic assessments, and design packages for mining and processing facilities targeting other strategic deposits, including kaolin, fluorite, apatite-ilmenite, graphite, and titanium-zirconium minerals.

The 1990s Transition Period

The financial crisis of 1990–1999 resulted in an outflow of skilled personnel and constrained scientific research across the industry.

To mitigate this downturn, Kryvbasproekt developed a comprehensive restructuring program for underground iron ore enterprises. Supported by state initiatives, this program successfully prevented a catastrophic collapse in output. Sector recovery was further bolstered by targeted legislative and regulatory measures, including the Law of Ukraine on the Economic Experiment in Mining and Metallurgical Enterprises and key Cabinet of Ministers resolutions on regional stabilization and restructuring.

Kryvbasproekt provided the core technical rationale and engineering solutions that underpinned these restructuring frameworks. These technical interventions, paired with broader economic stabilization across Ukraine, enabled production recovery, improved operational balance sheets, and positioned the industry to exit a prolonged downturn.

21st Century Operations

Since the turn of the century, Kryvbasproekt has concentrated on addressing modern operational challenges faced by mining enterprises. Through applied research, the team designs and implements engineering solutions to enhance product competitiveness, lower unit production costs, secure long-term resource reserves, and reduce environmental impact. These initiatives helped increase commercial iron ore production across Kryvbas from 51.5 million metric tons in 2003 to 63.67 million metric tons in 2012.

Alongside core mining engineering, Kryvbasproekt has delivered design packages for industrial transport, power grids, maintenance infrastructure, municipal heat and water supply, gas distribution networks, as well as civic, social, and commercial buildings.

The institute has repeatedly won national engineering competitions for outstanding public, residential, and industrial architecture, earning 1st- and 2nd-degree diplomas from the Ministry of Regional Development and Construction of Ukraine.

Kryvbasproekt Today

Today, Kryvbasproekt focuses its engineering and research capabilities on maximizing client efficiency, improving finished product quality, advancing resource conservation, and reducing both capital (CAPEX) and operational (OPEX) expenditures. Sustainable natural resource management, environmental compliance, and industrial energy efficiency remain central to all project designs.