Throughout the entire history of the institute, the vast majority of completed engineering projects have successfully addressed critical operational challenges, distinguished by high efficiency and large-scale implementation. The work performed by the institute’s specialists aligns with the strategic priorities of the mining and metals sector, focusing on the development and implementation of energy-saving mining technologies, ensuring product competitiveness, and boosting operational efficiency.
The institute’s engineering team has accumulated extensive experience in designing major underground mines, open-pit mining and processing plants (GOKs), ore-repair facilities, and heavy machinery manufacturing plants.
The diversity of projects delivered by the institute extends far beyond mining facilities alone.
In recent years, design packages have been completed for transportation, power infrastructure, maintenance facilities, heating and water supply networks, gas distribution, as well as civic, social, and cultural infrastructure. In particular, commissioned by municipal authorities, the institute engineered and supervised the construction of the third stage of the Kryvyi Rih rapid tram line, the first stage of the Radushanske water supply pipeline, gas supply networks for adjacent communities, municipal wastewater treatment plant upgrades, boiler houses, urban streets, and public squares, alongside pedestrian bridges and national highways.
Key complex, high-priority engineering, design, and research projects executed and currently in progress by KRYVBASPROEKT include:
2024 |
|
| Kryvyi Rih Geological Expedition Branch of the SE “Ukrainian Geological Company”
“Quarterly monitoring of engineering-geological processes that may affect and do affect land conditions and soil properties in the impact zone of planned activities of PJSC ‘ArcelorMittal Kryvyi Rih’ for 2024”
|
Engineering-geological surveys and laboratory testing of soils (monoliths) are being carried out as part of the project surveying scope. |
| LLC “KRYVBASGEOPROEKT”
“Reconstruction of the 330 kV ‘Kryvorizka’ Substation with the installation of physical protection systems for autotransformers AT-1”
|
Completed engineering-geological surveys for the facility. |
| PrJSC “CGOK” (Central GOK)
“Designer supervision of mining operations at Open-Pit No. 1, the South-Western Waste Dump, Waste Dump No. 6, reclamation of Open-Pit No. 2, and the external waste dump on the footprint of Open-Pit No. 2 of PrJSC ‘CGOK’ in 2024”
“Designer supervision of mining operations at Open-Pit No. 3, the Northern Waste Dump of Open-Pit No. 3, the Eastern Waste Dump, and Waste Dump No. 2 of PrJSC ‘CGOK’ in 2024”
“Designer supervision of mining operations at Open-Pit No. 4, Waste Dump No. 3, and the Western Waste Dump of Open-Pit No. 4 of PrJSC ‘CGOK’ in 2024”
|
Under the contract between LLC “KRYVBASPROEKT” and PrJSC “CGOK”, ongoing designer supervision is provided for mining operations across PrJSC “CGOK” facilities in 2024. |
| LLC “METINVEST SICHSTEEL”
“PJSC ‘InGOK’. Comprehensive project for phased mining operations and mineral processing development until the depletion of the Inhulets deposit. In-pit crushing and conveying (IPCC) systems for ore hoisting from horizons (-300) m and (-360) m of the ‘Eastern’ and ‘Western’ routes”
|
As part of the Comprehensive Mining Development Project through deposit life-of-mine at PrJSC “InGOK”, designer supervision is being performed for the construction of crushing and conveying systems. |
2023 |
|
| PrJSC “CGOK”
“Reconstruction of the waste dump facilities of Open-Pit No. 4 of PrJSC ‘CGOK’”
|
During preparation of design and cost estimation documentation, the mining and process engineering sections of the detailed design were developed, alongside general site layout and transport logistics, waste dump water protection measures, design documentation for a radiation fallout shelter, civil defense engineering measures, sanitary protection zone design, and an Environmental Impact Assessment (EIA).
|
| PJSC “Kryvbaszalizrudkom” (KZREK)
“Access development and mining of high-grade ores at horizons 1575 m and 1650 m of the ‘Ternivska’ mine. Reconstruction to sustain enterprise production capacity”
|
In addition to engineering and cost estimation documentation, an Environmental Impact Assessment (EIA) report was prepared, along with representation during public hearings and obtaining the official EIA clearance.
|
| PrJSC “PivnGOK” (Northern GOK)
“Development of a working land management project for the reclamation of disturbed land — removal and preservation of topsoil associated with the reconstruction of the Hannivskyi open pit”
|
Developed a working land management project for disturbed land reclamation, including agricultural engineering measures and the formal land survey section.
|
| JSC “Kryvbaszalizrudkom”
“Main drainage system at the 1510 m horizon of the ‘Novyi’ shaft, ‘Kozatska’ mine”
|
Determined key engineering solutions and prepared detailed working documentation for the main drainage underground excavation.
|
2022 |
|
| PrJSC “PivnGOK”
“Development of a working land management project for the reclamation of disturbed land — removal and preservation of topsoil associated with the expansion of waste dumps at the Hannivskyi and Pershotravnevyi open pits”
|
Developed a working land management project for disturbed land reclamation, including agricultural engineering specifications. |
| PrJSC “CGOK”
“Working project for the waste dump facilities of Open-Pit No. 4”
|
Determined basic engineering concepts, performed geomechanical justification for external waste dump parameters, and prepared the mining operations schedule for the waste dumps.
|
| PJSC “Kryvbaszalizrudkom”
“Ventilation crosscut ‘Nova-Pivnichna’ at the 1415 m horizon of the ‘Oktiabrska’ mine”
|
Engineered the layout and route of the ventilation crosscut with calculation of mining gradients and generated detailed working drawings.
|
| PrJSC “CGOK”
“Adjustment of the mining design section: ‘PrJSC CGOK. Access and mining of reserves of the Pivdenna-Magnetytova deposit at levels 527–447 m and 607–527 m of the Ordzhonikidze mine’”
|
Engineered and modeled the mine ventilation system for underground development within the scope of the project adjustment.
|
2021 |
|
| PrJSC “Poltava GOK”
“New construction of the fine grinding department of the primary production section – 2 at the crushing and beneficiation plant, including installation of HPGR equipment” |
Developed preliminary technical solutions, dismantling documentation for primary equipment, site preparation with relocation of utility lines, buildings, and structures in the construction zone; produced engineering and cost estimation documentation covering technological, electrical, architectural, structural, plumbing, and fire safety systems, as well as construction management, master plan layout, and landscaping; prepared baseline data for the EIA process.
|
| Working land management projects for land reclamation across PJSC “ArcelorMittal Kryvyi Rih” facilities:
“Reconstruction of the MYROLIUBIVKA tailings facility” and “Reconstruction of tailings facility Section IV”
|
Developed and coordinated baseline engineering solutions with the client’s departments regarding technical land reclamation. |
| PrJSC “ZZRK” (Zaporizhzhia Iron Ore Plant)
“Southern ventilation shaft No. 2 at 0–355 m depth with industrial surface complex. New construction”
|
Delivered engineering and cost estimation packages covering mining, process, electrical, and structural engineering; completed the construction organization plan, feasibility metrics, and Environmental Impact Assessment.
|
| PJSC “Kryvbaszalizrudkom”
“Development of working documentation for the capital overhaul of structural steel components of the mine headframe, back-leg brace, and rope support mast of the ‘Oktiabrska’ mine”
|
Prepared detailed engineering drawings for the back-leg brace, headframe, and support mast, preceded by on-site engineering surveys and dimensional structural assessments. |
| PJSC “Kryvbaszalizrudkom”
“Access development and mining of high-grade iron ores at horizons 1575 m and 1650 m of the ‘Ternivska’ mine. Reconstruction to sustain enterprise production capacity”
|
Prepared an EIA report as part of the project documentation, supported public consultations, and secured statutory environmental clearance. |
| Research and Development (R&D):
“Investigation and analysis of key technical and economic parameters affecting operational efficiency at PrJSC ‘SUKHA BALKA’” |
Conducted baseline data collection, modeled techno-economic indices, and performed an operational efficiency analysis for the company. |
| Research and Development (R&D):
“Analysis of geological and mining conditions to optimize open-pit boundary parameters for the Pershotravnevyi open pit of PrJSC ‘PIVNGOK’” |
Collected, reviewed, and interpreted baseline geological data and historic engineering designs; completed the final research study on pit slope and perimeter optimization.
|
| PrJSC “CGOK”
“Development and access of deep levels of Open-Pit No. 3 (Stage IV deepening)” |
Engineered core technical concepts, performed geomechanical assessments and mine scheduling for Open-Pit No. 3; prepared working documentation for mining, process engineering, general layout, and transport infrastructure.
|
| PrJSC “CGOK”
“Detailed territorial plan for the expansion of waste dump facilities at the Hleyuvatskyi open pit. Land allocation for the construction of the ‘Obiednanyi’ waste dump” |
Conducted pre-design studies, preliminary EIA, Strategic Environmental Assessment (SEA), detailed site plan development and updates, including presentation and defense before the municipal urban planning council.
|
2020 |
|
| PrJSC “InGOK”
“Reconstruction of the overburden waste dump. Mining a designated section of the waste dump primarily composed of talc schists of the Inhulets ferruginous quartzite deposit” |
Developed and agreed basic engineering solutions with the client; prepared the detailed working design; provided regulatory escort through state expert evaluation until positive sign-off was received.
|
| PrJSC “InGOK”
“Mining of the Inhulets deposit by the open pit of PrJSC ‘InGOK’ within the license perimeter”
|
Delivered urban planning calculations, sanitary protection zone designs, land reclamation and mining lease designs, and designed early warning systems for emergency situations. |
|
Feasibility Study (TEO): Optimization of the Hleyuvatskyi open-pit boundary considering updated rock mass strength properties
|
Calculated feasibility metrics, justified the optimal pit boundary limits, assessed multiple in-pit haulage alternatives, and completed environmental impact assessments.
|
2019 |
|
| PrJSC “CGOK”
“Capital overhaul of sections No. 12–13 of the beneficiation building at the processing plant”
|
Prepared detailed design and cost estimation packages with mandatory state expert review clearance; carried out preliminary on-site surveying and dimensional assessments. |
| PrJSC “CGOK”
Feasibility Study (TEO): Construction of dust extraction and aspiration systems at conveyor transfer stations 1–6 of the hoisting sector at the Ordzhonikidze mine
|
Delivered feasibility study for dust aspiration units at conveyor transfer stations; prepared EIA documentation and performed high-risk industrial facility identification.
|
| PrJSC “SUKHA BALKA”
“Deepening the shaft of the ‘Yuvileina’ mine from horizon 1500 m to 1660 m” |
Engineered design specifications for customized non-standard equipment and updated detailed working drawings for shaft sinking operations.
|
| LLC “Sauliak”
“New construction project for a mining and processing plant based on the ‘Sauliak’ deposit”
|
Conducted pre-design feasibility assessments including alternative design variants per client requirements; completed the preliminary site works engineering package. |
| PJSC “Kryvbaszalizrudkom”
“Deepening the shaft of the ‘Ternivska’ mine from horizon 1575 m to 1725 m” |
Developed working documentation for customized non-standard equipment and generated detailed fabrication drawings for structural steel.
|
2018 |
|
| PJSC “Kryvbaszalizrudkom”
“Access development and mining of high-grade iron ores at horizons 1575 m and 1650 m of the ‘Ternivska’ mine. Reconstruction to sustain enterprise production capacity”
|
Carried out engineering surveys and structural diagnostic assessments; generated design and cost estimation documentation for underground mining workflows and site construction organization. Engineered industrial sanitary protection zone limits and performed hazard assessments; established geological-industrial deposit characteristics; delivered technological, structural, HVAC, electrical, master plan, and logistical solutions for crushing and screening plant retrofits; evaluated capital feasibility indices to sustain enterprise capacity.
|
| PJSC “Ukrainian Mineral Fertilizers”
“Reconstruction of the Central Control Laboratory (TsKL) building with conversion into a mineral fertilizer processing and storage complex” |
Calculated feasibility options for repurposing; engineered dismantling plans for smelting and roasting furnaces; delivered full design and budget packages for facility conversion.
|
| PJSC “ArcelorMittal Kryvyi Rih”
“Reconstruction of buildings and structures of Sinter Machine No. 6 complex, Sinter Plant No. 2”;
“Reconstruction of buildings and structures of Sinter Machines No. 1–5 complex, Sinter Plant No. 2, and aspiration systems of Sinter Plant No. 3”
|
Prepared design, cost estimation, and detailed working drawings for the reconstruction of sinter plant structures; conducted formal technical passportization for facilities. |
|
“Design documentation for the major overhaul of the public national highway H-23 Kropyvnytskyi–Kryvyi Rih–Zaporizhzhia”
|
Completed topographical, geodetic, and engineering-geological surveys alongside detailed working documentation for highway rehabilitation; provided engineering supervision and environmental impact analysis.
|
| LLC “Rozvytok Pobuzhzhia”
“Pre-design engineering for the new construction of a mining and processing plant to develop the Balakhivske graphite deposit, Petrove District, Kirovohrad Oblast” |
Executed conceptual pre-feasibility design and generated initial working construction drawings. |
|
Reconstruction of building complexes to house Branch No. 4 of the Diagnostic and Treatment Center LLC “MEDICOM KRYVBAS”
|
Prepared site preparation engineering package.
|
2017 |
|
|
“Reconstruction of the station square at Kryvyi Rih – Holovnyi railway station”
|
Conducted engineering surveys; completed draft architectural designs and detailed working drawings for the square redevelopment.
|
| PJSC “ArcelorMittal Kryvyi Rih”
“Sinter and Blast Furnace Department. Sinter Plant. Sinter Plant No. 3. Ore and fuel stockyard PU-5: gallery No. 5, gallery No. 7. Capital overhaul”
|
Executed engineering surveys and structural integrity inspections; developed conceptual engineering and working drawings for capital repairs. |
| Navoi Mining & Metallurgical Combinat (NMMC)
Engineering chapter “Construction of inclined shafts and in-pit crushing and conveying (IPCC) ore hoisting complex” under the Feasibility Study for Muruntau Open-Pit Mining (Stage V)
|
Engineered designs for inclined shafts carrying utility networks and designed an intermediate blending stockyard at the shaft portals.
|
|
“Feasibility Study and Decommissioning Project for the Oleksandrivskyi and Shevchenkivskyi open pits”
|
Calculated baseline feasibility metrics, prepared site construction management plans, and completed environmental impact assessments. |
2016 |
|
| PJSC “Kryvbaszalizrudkom”
Feasibility Study (TEO) on the viability of reconstructing the ‘Lenina’ mine of PJSC ‘Kryvbaszalizrudkom’ regarding slicing and extraction of iron ores at horizons 1575–1650 m
|
Determined key technological mining schemes for target horizons and provided technical-economic rationale for facility reconstruction. |
| PJSC “Kryvbaszalizrudkom”
Technical modernization of the skip hoisting plant at the ‘Hvardiiska No. 1’ mine
|
Conducted on-site surveys and measurements; prepared basic engineering solutions and cost estimation packages for custom non-standard equipment, batcher upgrades, and video monitoring systems.
|
2015 |
|
| Lebedinsky GOK
Engineering design for mining the Lebedinskoye and Stoylo-Lebedinskoye ferruginous quartzite deposits
|
Produced design and cost estimation packages for open-pit mining expansion; evaluated technical and economic alternatives for pit haulage; prepared site organization designs, EIA, sanitary zone layouts, and environmental protection plans including land reclamation.
|
| “Ukrainian Ore and Metallurgical Company”
“Feasibility study on the viability of completing construction of the Kryvyi Rih Mining and Processing Plant of Oxidized Ores (KGOKOR)” |
Engineered primary conveyor haulage routes from the resource base to the KGOKOR industrial site; compared technical and economic performance of continuous conveyor transport versus industrial rail haulage. |
Comprehensive project for the phased development of mining operations and mineral processing through the end of the Inhulets deposit life-of-mine. The implementation of this project ensures efficient subsoil resource utilization, enhances competitiveness, and consolidates the plant’s position in both domestic and international iron ore raw material (IRM) markets. Within the framework of this project, underground […]
During the development of this Feasibility Study (TEO), key techno-economic indicators were determined for the access development and mining of naturally high-grade iron ore reserves at the 1575 m and 1650 m horizons of the “Ternivska” mine. The development and implementation of the project under the selected optimal scenario, among those evaluated in this feasibility […]
Prepared detailed working design and cost estimation documentation with full state expert certification approval. Conducted on-site measurements and structural condition surveys.