Today, LLC “KRYVBASPROEKT” is a scientific and engineering complex providing scientific research, engineering surveys, and design services to support the extraction, processing, and comprehensive utilization of mineral resources. In our work, we apply mathematical modeling methods and state-of-the-art licensed software. We also maintain an extensive database of geological, environmental, geodetic, and hydrogeological data.
Our team consists of approximately 60 highly qualified specialists with extensive experience, practical skills, in-depth theoretical knowledge, and certified qualification credentials for key roles, including architects, design engineers, land management engineers, and technical experts.
We carry out forecasting, assessment, feasibility studies, analytical, exploratory, engineering, and design work for projects of varying complexity.
Our portfolio includes design projects for transportation, power supply, maintenance facilities, heating and water supply, gas distribution, as well as social, public, and cultural infrastructure.
We provide:
Feasibility studies (TEO) and architectural/designer supervision during construction
Structural condition assessments of buildings and facilities
Land management documentation
Engineering and geodetic surveys
Mutual respect, rapid response to client inquiries, flexible pricing, a tailored approach to every project, and premium design quality are the core priorities of our client partnerships.



Comprehensive project for the phased development of mining operations and mineral processing through the end of the Inhulets deposit life-of-mine. The implementation of this project ensures efficient subsoil resource utilization, enhances competitiveness, and consolidates the plant’s position in both domestic and international iron ore raw material (IRM) markets. Within the framework of this project, underground […]
During the development of this Feasibility Study (TEO), key techno-economic indicators were determined for the access development and mining of naturally high-grade iron ore reserves at the 1575 m and 1650 m horizons of the “Ternivska” mine. The development and implementation of the project under the selected optimal scenario, among those evaluated in this feasibility […]
Prepared detailed working design and cost estimation documentation with full state expert certification approval. Conducted on-site measurements and structural condition surveys.