Feasibility Studies & Techno-Economic Assessments

The development of a Feasibility Study (TEO) is carried out on the basis of a long-term development plan for the industrial sector to which the designed facility belongs (mine, mineral processing plant, etc.). The Feasibility Study must address the following issues: — the impact of the projected facility on industry productivity growth; — justification of production capacity and site location of the facility; — opportunities for operational and economic cooperation with enterprises of the given industrial district; — the impact of the projected facility on other industrial sectors; — estimated figures on capital expenditures (CAPEX) and production costs (OPEX); — comparison of anticipated techno-economic indicators with domestic and international benchmark facilities; — scope of additional research and survey works prior to detailed project engineering.

 

For large-scale enterprises, the Feasibility Study is developed by a specialized design and engineering institute; for small-capacity facilities, by the relevant ministerial department overseeing the sector. The Feasibility Study is reviewed and approved by the ministry (or the Client). Based on the approved Feasibility Study, the Client prepares the project design assignment.

 

The term “Feasibility Study” generally shares the same underlying substance as project appraisal; however, it is traditionally interpreted in a narrower technical sense as the evaluation of investment projects specifically from commercial, technical, and financial perspectives.

 

A Feasibility Study (TEO) is a calculation of the economic viability of project implementation, based on a comparative appraisal of costs, operational efficiency, and capital investment payback periods. A Feasibility Study ensures the prudence and justification of every step in the realization of your strategic goals.